East Pressure Zone Project

The East Pressure Zone project is a part of Water and Wastewater Infrastructure Servicing. The project includes: 

  • A new water tower in the Southwest area of town near Hwy 12 and Hwy 93 to support future growth and expansion.
  • A new booster pumping station to create a new pressure zone in the Southwest, servicing new growth areas and addressing existing pressure constraints.
  • Over 1.4 km of new watermain to connect existing pressure zones and service expansion areas.

Project Timeline

1

Water Master Plan

August 2021 - East pressure zone’s long-term storage and pressure deficiencies were identified.

2

Research and analysis

2024 to 2025 - In-depth research and analysis by consultant.

3

Public Information Centre

January 2025 - Public attended the PIC to learn about the project. Read the Notice of Study Commencement and Public Information Centre.

4

Municipal Class Environmental Assessment

May 2025 - Public comment period from May 14 to June 15, 2025

5

Consultant for design

Spring/Summer 2025 - Town staff will work with consultant through design submissions.

6

Construction

2026 - Construction is projected to start in 2026.

Municipal Class Environmental Assessment

The study included input from Indigenous and technical stakeholders and the public. The preferred servicing solution for the Town identified through this Class EA is to build a new Elevated Tower and Booster Pumping Station at the selected site south of Highway 12 and west of Beamish Road. The new watermain supplying the new Elevated Tower will connect to existing infrastructure along Beamish Road through an easement on the property east of the site. The new Booster Pumping Station will supply water via a new watermain crossing Highway 12 to the north, as well as a new watermain extending west toward Brebeuf Road to service the southern development areas.

The completed Class EA for Midland's East Pressure Zone is open to the public for a 30 day review period. Any comments can be submitted to the project contact by June 15, 2025.