Monday, February 2, 2026
Posted at 3:45pm
Priority roads (class 3 and 4): All Priority routes were completed overnight.
Secondary roads (class 5 and 6): Secondary routes were finished during overnight operations.
Downtown area: The downtown area was plowed and sanded by night crews.
Sidewalks: Sidewalks are currently being cleared and sanded by day crews.
Additional maintenance included snow clearing in municipal parking lots overnight, with work continuing into this evening. Snow removal on the east side of town focused on hilled streets, including Percy’s Peaks, using large blower equipment. Day crews are continuing snow removal operations today.