Additional Connection Permits
When a resident needs a new service connection to the Town's Infrastructure an Additional Connection Permit is required. This includes water, storm, or sanitary lateral services.
Additional Connection Permit Application
Frequently Asked Questions | ||||
|
Application Process |
1. Applicant fills out Additional Connection Permit (ACP) Application Form and a Roads Occupancy Permit (ROP) form if required.
2. The Additional Connection Permit Application requires: |
Insurance Required |
Applicant must maintain and pay for Comprehensive General Liability Insurance. • The insurance must be a minimum of $5 million. |
Permit Conditions |
There are additional conditions that the issuer (Manager of Engineering or designate) can choose to put on the permit which include: • The following conditions are on each and every Additional Connection Permit: o The design will be completed and stamped by a Professional Civic Engineer. A representative from the design engineering firm shall inspect the works on a full-time basis and shall provide the Town with a certificate of substantial completion once the project has been completed. A maintenance period may be required after the works has been completed for a time duration at the Town's discretion. |
Permit Instructions & Fees |
1. All information must be printed and legible. Failure to meet this condition will result in a delay and/or request being denied. |
Printable Versions of:
Additional Connection Permit Application
Additional Connection Permit Procedures
If you have any questions and/or to submit your printable versions please email
engineering@midland.ca